Password requirements:
6 characters or longer
Contain numbers and digits
At least 1 uppecase and 1 lowercase
Stop asking what is standard — there is no such thing, and the question hides the two that matter. What is this deposit for? and what does your state allow? Three different things get called a deposit and they justify different amounts. And the legal ceiling varies enormously: Maryland permits up to a third of the contract, California caps it at $1,000 or 10%, whichever is less. On a $12,000 job that is $4,000 in one state and $1,000 in the other.
Deposits are the most confidently discussed and least examined subject in the trades. Everyone knows what they take. Very few can say what it is for, and a fair number are over their state’s limit without knowing there is one.
Say which one you are asking for and the conversation changes completely. “I need $600 before I order the tiles, because they are cut to size and I cannot return them” is a fact. “I take 30% up front” is a policy, and policies get negotiated.
It also tells you when you need one at all. On a $300 repair with no materials you are fronting nothing and holding no slot — asking for a deposit there costs you jobs and gains you nothing.
The commonly quoted figures are 10–33% up front. Both ends of that are illegal somewhere.
So the useful advice is not a percentage. It is: look up your own state once, write the number down, and price around it. Ten minutes, once, for the life of the business.
If your state does cap you tightly, that is not a disaster — it just means the deposit is the wrong tool and the payment schedule is the right one. Charging for design, and taking a deposit works that through end to end for a materials‑heavy trade, including how to structure stage payments so your outlay is covered without a large deposit.
One small correction to the usual advice, and it matters: take the deposit before you order the materials, not before the job starts. Those are often weeks apart, and the gap is where the money is at risk.
Deposits feel awkward to ask for because operators phrase them as a demand for trust. Phrase it as a step in the process instead and almost nobody objects.
“The way it works: I take $600 to order the materials, that’s on the quote, and the balance is due when it’s finished. Once that’s in I can get the order placed and we’re on for the 14th.”
Three things make that work. It is procedural, not personal. It names what the money does. And it ends with what they get — a date — rather than with a request. You are describing how the job proceeds, not asking for a favour.
Take it seriously, both as information and as a decision.
A deposit only protects you if it is written down where the job is.
BizBaby puts the deposit terms on the quote the customer approves online, so what was agreed and when is a record rather than a recollection. Take the payment on the spot, invoice the balance when the work is marked done, and see at a glance which jobs still have money outstanding — which is the same list you need for chasing an invoice.
Free for the first three months.
Checked in August 2026. Deposit limits are state law and vary more than almost anything else in this catalogue. The two below are cited as the two ends of the range, not as advice for your state — look yours up.