Painting
What a painting quote should actually say
In this article
A painting quote is not a price with a number on it. It is a scope document, and the parts that protect you are the ones describing what you are not doing. Nearly every dispute in this trade is about something nobody wrote down — furniture, filling, ceilings, a second colour, the wall that turned out to be damp.
You will send hundreds of these. Getting the template right once is worth more than any individual job, because it does three things at the same time: it wins work, because a clear quote reads as competence; it prevents arguments; and it makes the arguments you do have short.
What every painting quote needs
| Section | What goes in it | Why |
|---|---|---|
| Scope, room by room | Which rooms, and within each: walls, ceilings, trim, doors, closets — listed, not implied. | “Paint the upstairs” means different things to you and to them, and they are the one paying. |
| Preparation | Filling nail holes, sanding, caulking, washing, priming. Say what level, and what you are not doing. | Prep is where paint jobs are won and lost, and where customers assume the most for free. |
| Coats and products | Number of coats, brand and finish, and who supplies the paint. | If they supply it, you do not warranty the finish. Say that. |
| Colours | How many, and the deadline for choosing them. | A colour decided on day three is a delay you are paying for. A second colour in one room is extra cutting‑in. |
| Exclusions | Everything you are not doing — see the next section. | The most valuable part of the whole document. |
| Price, deposit, schedule | Total, deposit, when the balance is due, and what “complete” means. | Large deposits are commonly quoted as normal and are capped by law in several states — check yours. Define completion or the balance floats forever. |
| Change orders | Any change is written, priced and signed before the work. | This one clause is the difference between a good margin and a free afternoon. |
| Timing and validity | Start window, rough duration, and how long the price holds. | Thirty days is normal and nobody objects. Material prices move. |
The exclusions are the document
If you take one thing from this article: a quote that lists only what you will do is half a quote. These are the ones that cause real arguments, in rough order of how often:
- Furniture. Who moves it, and who moves it back. “Room to be cleared by customer” is a sentence worth money.
- Repairs beyond filler. Drywall patching, water damage, rot, failed plaster. Priced separately, on inspection.
- Wallpaper removal, which is never a small job and is never included by accident.
- Ceilings, unless listed. Customers assume ceilings. You do not.
- Damp, mould and staining. You can paint over a symptom but you cannot fix the cause, and if you paint it you own it. Exclude it, and say why.
- Lead‑safe work in pre‑1978 homes if you are not certified — and if you are, price it, because containment and clean‑up take real time.
- A second coat over a dark colour if you quoted two. Colour changes need three, and the argument is easier before you start.
- Touch‑ups after the customer moves furniture back in. Snags on completion, yes. Scuffs from their sofa, no.
Changes go in writing before the brush moves
“While you’re here, could you just…” is how a profitable job becomes a break‑even one. It is rarely the customer being difficult — you are standing there with a brush and to them it looks like ten minutes.
The script that works, said out loud and without apology: “Happy to do that. It’s about half a day, so it’d be $X — want me to add it?” Almost everyone says yes. Almost nobody argues with a number given before the work.
Then write it down. A change order needs four things and fits in a text message: what changed, what it costs, what it does to the finish date, and a yes. In the wider contracting trades a combined overhead‑and‑profit mark‑up on change orders of around 15% is the normal ceiling — but the number matters far less than the habit.
Deposit, stages and what “finished” means
- Take a deposit — but check your state’s cap first. 20–50% is often quoted as standard, and in several states it is illegal. California caps a home improvement down payment at 10% of the contract or $1,000, whichever is less, and exceeding it is a misdemeanour. Look yours up once, then structure the rest as stage payments tied to milestones. The deposit rules are explained here.
- Tie stage payments to milestones, not to dates. “On completion of the ground floor” is a fact; “halfway” is an opinion.
- Define completion in the quote. Something like: all listed surfaces coated, snag list agreed and cleared, site cleaned. Otherwise the balance waits on a feeling.
- Separate snags from extras. A missed patch is a snag and you fix it. A newly requested door is an extra and it is a change order.
- Put a validity period on the price. Thirty days.
The two legal lines to check for your state
This is a trade article, not legal advice, and contract law is state law. Two things are worth checking properly for where you work:
- Lead paint disclosure. Federal rules require certified firms working on pre‑1978 housing to give the household an EPA‑approved lead information pamphlet before work starts, and to keep records that you did. Build it into your quote flow so it cannot be forgotten.
- Right to cancel. Many jurisdictions give consumers a cooling‑off period on contracts signed in their home — often three days. Putting the clause in yourself costs nothing and looks professional; omitting one that is legally required can make the contract unenforceable.
The quote is also your best piece of marketing
Most people getting three painting quotes are not comparing skill, because they cannot see it yet. They are comparing the documents. So:
- Send it the same day. The first credible written quote wins a startling share of residential work.
- Write it in plain language. No trade shorthand. They should be able to read it to their partner.
- Offer options rather than one number — walls only, walls and trim, everything. It moves the conversation from “yes or no” to “which one”, and the middle one usually wins.
- Put your certifications and insurance on it. Lead‑safe certified, insured, certificate on request.
- Attach the photographs you took at the walkthrough. It proves you looked, and it settles every later argument about pre‑existing damage.
- Make it easy to say yes — approval and deposit in one place, not a signature scanned and emailed back.
Build the number underneath it with how to price a painting job and the painting quote calculator. This article is about what the customer sees; that one is about whether it pays.
Everything above is a template problem, and templates rot when they live in a word processor: one van has last year’s exclusions, somebody deletes the change‑order clause to fit a page.
BizBaby keeps the quote as an estimate template — your scope, your exclusions, your terms, the same every time — that goes out the same day and gets approved online with the deposit taken on the link. The approved estimate becomes the job, so the scope you agreed is the scope that gets scheduled and invoiced. Changes get added to the job and appear on the final invoice instead of in somebody’s memory, and the walkthrough photos stay attached to the record.
Free for the first three months.
Sources
Every figure above comes from one of these, checked in August 2026. This is a trade article and not legal advice — contract and consumer law vary by state, and a local attorney reviewing your template once is cheap.
- US EPA, Renovation, Repair and Painting Program — the pre‑1978 rules, the pamphlet requirement and the record‑keeping that goes with them.
- Angi, what should be in a house painting contract — useful because it is written for the customer, so it tells you what they are looking for when they compare your quote with two others.
- Rocket Lawyer, painting contract — a general legal template to compare your clauses against.
- The deposit range, change‑order mark‑up ceiling and completion‑definition practice are drawn from how the contracting trades teach it, cross‑checked across several independent references. They are conventions, not law.
Keep reading
More painting
How to price a painting job
Painting is the trade where the quote and the job are furthest apart. Two identical rooms, same size, same paint — one t...
Read guide →How to start a painting business
Painting has the lowest barrier to entry of any trade in these guides. A brush, a ladder and a van and you are working....
Read guide →How to get painting jobs
Painting is bid work, so you are not really in the painting business — you are in the quoting business, and painting is...
Read guide →Knowing what to charge is step one
First 3 months free. No card required. Bring the whole team.
Start Free Trial